I was all over Manhattan a couple of weeks ago

Thinking about all the old buildings, the architecture, some over 200 years old, the immensity and density, mixing the old and the new, and then thinking about the city UNDER the city, the subways and basements, steam and sounds coming up from under the sidewalk vents, all at sea level, or below, battling back the ocean., housing and hosting millions of people every day.

Amazing place.
Amazing that all that stands together all these years.
 
Last edited:
The steel beams in the photo look really rusted out. Could be a problem with not enough DT analysis to engineer suitable shoring.
Shouldn't all of that been addressed with the plans submitted to the approval board before they could start construction?
 
I would almost guarantee there was a meeting with engineers at one point where it was asked, "Do we really need all that safety margin? You can't take a little out, what you have here doesn't work with the project budget."
 
Click once and the prompts swarm all over me.

A recent rabbit hole for me is filled with pancaked high rise buildings that have recently tumbled. Argentina, for sure, but China, South Florida and Central Florida, your San Fran and the Pacific rim of fire.

Now Etna has gone active again.

It's 'End Times' I tell you, End Times. Execute that bucket list NOW! That's what I'm doing, again.
 
Shouldn't all of that been addressed with the plans submitted to the approval board before they could start construction?
No, not typically. They will review your finished structure, but usually not the means of construction.
 
Being a provincial rat, I've never even lived in a two story house. I have no desire to live in one of those mega-boxes. I'll take a shotgun shack on a creek anytime.
 
No, not typically. They will review your finished structure, but usually not the means of construction.
I thought you have to get approval of changes, basically the plans, before you are allowed to make the changes.
Isn't it the approval board's responsibility to assure that a building isn't going to fall down and kill people before it's modified in a major way?
 
I thought you have to get approval of changes, basically the plans, before you are allowed to make the changes.
Isn't it the approval board's responsibility to assure that a building isn't going to fall down and kill people before it's modified in a major way?
Nor really. That's what the stamp from the structural PE is supposed to cover. Whoever stamped these plans has been going through a lot of underpants this week
 
Nor really. That's what the stamp from the structural PE is supposed to cover. Whoever stamped these plans has been going through a lot of underpants this week
That was what I was partially getting at. The approval board would look for that stamp and should take a look at the plans to see if there is anything glaring, but I'm sure they'd trust the PE to have done a more thorough analysis.

His/her stamp/signature shouldn't mean shit anymore.
 